Our Tour of Lundy

Our Tour of Lundy

Yesterday Dennis, Walt, Dave, and I toured the unused space in the back wing of Lundy. It’s a lot of space and it doesn’t look that bad. Lowell is currently using it for storage, so almost all of the classrooms are full of school equipment.

Here is a description of the space:

Description Dimensions Square Feet
Classroom #12 31′ X 21′ 651
Classroom #14 31′ X 21′ 651
Classroom #15 31′ X 21′ 651
Classroom #16 31′ X 21′ 651
Classroom #17 31′ X 21′ 651
Classroom #18 31′ X 21′ 651
Girls Bathroom 21′ X 10′ 210
Boys Bathroom 21′ X 10′ 210
Room A 15′ X 8′ 120
Room B (no windows) 21′ X 10′ 210
Bonus 1 21′ X 13′ 273
Bonus 2 21′ X 13′ 273
Bonus 3 21′ X 13′ 273
Hallway 1 46′ X 8.5′ NA
Hallway 2 112′ X 8.5′ NA
Total: 5,475

 

  • The girls bathroom has 7 stalls and 4 sinks.
  • The boys bathroom has 5 urinals, 3 stalls, and 2 sinks.
  • There is a 12′ wide hallway that runs the length of the building.

Proposed Plan

  • Lowell School District will be responsible for all exterior and grounds related improvements.
    • Building inspection.
    • Air quality inspection.
    • Heating and ventilation inspection.
    • Put a new roof on the building.
    • Reside the west wing of Lundy with Select Cedarmill 5.250″ HardiPlank.
    • Replace all windows.
    • Paint the west wing of Lundy. Paint color will be picked out by Mountain View Academy.
    • Remove all items that are currently being stored in the west wing.
    • Build a 16′ wide driveway and 50′ X 30′ gravel parking lot in the field north of the Lundy west wing.
    • This driveway needs to have street entrance from E. Main Street.
  • Mountain View Academy will be responsible for all interior improvements.
    • Replace missing ceiling tile (I counted less than 10).
    • Repair damage done by roof leaks. I’m not sure if there is any, but I want to make sure this is investigated and addressed.
    • Split the 6 classrooms into 12 – 15′ X 21′ classrooms.
    • Convert bonus spaces into 3 – 21′ X 13′ classrooms.

Building Configuration After MV Academy Changes

Description Dimensions Square Feet
Classroom 1 21′ X 15′ 315
Classroom 2 21′ X 15′ 315
Classroom 3 21′ X 15′ 315
Classroom 4 21′ X 15′ 315
Classroom 5 21′ X 15′ 315
Classroom 6 21′ X 15′ 315
Classroom 7 21′ X 15′ 315
Classroom 8 21′ X 15′ 315
Classroom 9 21′ X 15′ 315
Classroom 10 21′ X 15′ 315
Classroom 11 21′ X 15′ 315
Classroom 12 21′ X 15′ 315
Classroom 13 21′ X 13′ 273
Classroom 14 21′ X 13′ 273
Classroom 15 21′ X 13′ 273
Storage 21′ X 10′ 210
Computer Lab 15′ X 8′ 120
Boys Bathroom 21′ X 10′ 210
Girls Bathroom 21′ X 10′ 210
Total: 5,349

After these changes are completed, we would have a capacity of 15 teachers and 225 students. This will make it possible for us to offer our services to all of the K-8th grade children who are considered a resident of the Lowell School District. I’m really excited about this opportunity. I was a little worried that we would have to cap our enrollment and possibly have a lottery if we received more applications than our space could accommodate.

lundy-usage-smaller

  • Yellow – shared outdoor area
  • Green – shared library, cafeteria, and gym
  • Orange – Academy exclusive use
  • Blue – Academy exclusive driveway and parking
Print Friendly, PDF & Email